Le test comprend 80 questions aléatoires.
Total de questions sur ce sujet : 147
Many large 2 stroke marine diesel engines are equipped with an auxiliary scavenge air blower. What is the purpose of this equipment?
To provide combustion air at start up, during manoeuvring and low load running when the turbocharger delivery is insufficient.
To allow full load running when the main turbocharger is defective.
To assist the main turbochargers in supplying combustion air when on full load.
To help cool the engine after it has been stopped.
What is the ideal working temperature for physical work?
Which of the following fittings shall be provided to all lifeboats?
A manually controlled lamp fitted on the outside.
A remotely operated steering arrangement.
An electric power starting system for the propulsion engine with one rechargeable energy source.
Permanent boarding arrangements on both sides to enable persons in the water to board the lifeboat.
Many large slow speed diesel engines operating on heavy fuel oil have a fuel injection system which features Variable Injection Timing. How does this affect engine operation?
VIT increases engine efficiency by automatically maintaining the maximum cylinder pressure over the entire load range.
VIT allows the ship’s engineers to alter the injection timing for each load setting with a simple single adjustment of the fuel rack.
VIT increases engine efficiency by automatically maintaining the maximum cylinder pressure over part of the load range.
Many large slow speed diesel engines operating on heavy fuel oil have a fuel injection system which features Variable Injection Timing. How does this affect engine operation?
VIT increases engine efficiency by automatically maintaining the maximum cylinder pressure over the entire load range.
VIT increases engine efficiency by automatically maintaining the maximum cylinder pressure over part of the load range.
VIT improves engine operation by automatically controlling the start of fuel injection when it detects a poor quality fuel.
VIT allows the ship’s engineers to alter the injection timing for each load setting with a simple single adjustment of the fuel rack.
A ship has a medium speed engine and a controllable pitch propeller propulsion system. What would the propeller pitch normally have to be at to allow starting of the engine?
What is the best method to use to remove heavy scale and fouling from the plates of a heat exchanger?
Use high-pressure cleaner with abrasive additives.
Soak the plates in recommended cleaning solution and then use a soft brush or pressure cleaner.
Use wire-brush metal scrapers and chipping guns.
When a fire breaks out in the accommodation, cargo holds or on deck, who is in charge of the fire fighting operations?
The first officer arriving at the scene.
The first person arriving at the scene.
The person who is designated in the muster list.
What is the correct name of the part highlighted in the illustration?
How many Radar Transponders (SART) are required to be carried onboard a ship for use in survival crafts?
2, one of which being capable of floating free if the ship sinks.
Two on each side of the ship.
One on each side of the ship.
B Class divisions in ships are constructed so that they are capable of preventing the passage of flame to the end of a standard fire test held for:
A ship moving through heavy seas is affected by the water presure at the bows causing an effect known as “Panting”. What structure in the forward region of the ship combats the effects of Panting?
Double bottom tanks and floors.
Panting beams and stringers.
Collision bulkhead and deck.
What would the First Engineer require?
The First Engineer would require the Chief Officer to keep him advised of bilge soundings.
The First Engineer would require the Fitter to check the carbon dioxide fire-fighting equipment.
The First Engineer would require cleaning of the feed water tank.
The First Engineer would require an inspection of the heating coils.
How many separate means of escape are provided from each fire zone above the bulkhead deck?
What do you call the wide rung on a pilot ladder that prevents the ladder from twisting?
The wide rung on a pilot ladder that prevents it from twisting is called a “Spreader”.
The wide rung on a pilot ladder that prevents it from twisting is called a “Wide step”.
The wide rung on a pilot ladder that prevents it from twisting is called a “Long rung”.
The wide rung on a pilot ladder that prevents it from twisting is called a “Ani-twist rung”.
For ideal synchronising as the incomer circuit breaker contacts make, the phase angle difference between the incomer e. m. f. and the busbar voltage should be:
On finding a person apparently unconscious in a High Voltage switch room, which of the following should be done?
Raise alarm then drag the victim clear so that they cannot reach live parts while receiving aid.
Check if the victim is in contact with live parts and if not apply first aid.
Raise alarm, identify means of isolation and apply before approaching victim.
Trip all breakers and approach victim.
Vibration analysis is often used as a conditioning monitoring tool onboard ship as part of the approved planned maintenance system. Many vibration measuring instruments are fitted with a harmonic filter/analyser. How would these filters normally be used during vibration measurement on a centrifugal pump?
To block out any noise or vibration from the surrounding engine room.
To generate an audible sound signal at the same frequency and amplitude as the vibration.
To isolate a single frequency of vibration associated with one of the pumps components.
To sum up all the harmonics of a base frequency to give total vibration for all of the pump’s components simultaneously.
Personnel in a high voltage switchroom and smell rotten eggs. What may this indicate?
Arcing at badly coupled bus bars.
Problems with a vacuum circuit breaker.
Problems with a gas (SF6) circuit breaker.
As part of the regular maintenance for a paramagnetic oxygen analyser used for measuring the oxygen content of exhaust gas it is important to keep the sample line filter as clean as possible. Why is this necessary with this type of instrument?
The filter may rupture due to the high pressures generated by the sample pump.
Pressure variations in the sample chamber can cause errors so restrictions must be kept to a minimum.
The pressure drop across the filter may damage the sampling pump.
A high flow rate is required in order to deflect the sensing element.
Which of the following instruments is normally part of a control-loop?
What action should be taken by the engine room rating if a piece of machinery is not functioning properly?
If machinery does not function properly, the Chief Engineer should be called out immediately.
If machinery does not function properly, it should be immediately stopped every time.
If machinery does not function properly the duty Engineer should be informed immediately so that plans for further action can be made.
If machinery does not function properly, it should be stopped and serviced immediately.
A seawater pump requires overhaul but there are no spare wear rings for the casing and impeller. It is decided that new wear rings will be fabricated onboard using the ship’s lathe. What would be the most suitable material to use to fabricate the rings onboard?
What is the objective of the merchant navy?
To earn money for the shipowner.
To transport and deliver goods as quickly as possible.
To provide employment for persons who wish to become seafarers.
To safely transport goods by sea.
What cooling medium is normally used to cool the condenser of a fresh water generator?
After main power is restored (following a blackout), a timed sequential restart of motor driven auxiliaries is necessary to avoid:
Generator overload due to many motors starting at simultaneously.
Overvoltage due to current surges.
Overloading creating earth faults.
Over-frequency due to overspeed of generator.
Which of the following voltage levels would be regarded as high voltage likely to be found on a ship?
Which one of the listed requirements regarding the stowage of a survival craft corresponds to present SOLAS regulations? Each survival craft shall be stowed:
In a secure and sheltered position and protected from damage by fire or explosion.
Wherever space is available.
In a state of readiness so that two crew-members can prepare for embarkation and launching in less than 15 minutes.
On the starboard side of the ship.
What is the meaning of “make fast”?
During an unmanned period on a UMS vessel the “low water level” alarm for the jacket cooling water system expansion tank activities. What action would you take as duty engineer?
Answer the alarm then block the alarm function for later action and resume unmanned operation.
Answer the alarm then block the alarm and change to manned engineroom condition.
Answer the alarm and adjust the alarm set point for the water level in the expansion tank before resuming unmanned operation.
Answer the alarm, top up the tank and check the system for leakage before resuming unmanned operation.
Why is it important to check the timing of diesel engine cylinder oil lubricators?
To ensure the piston is not covering the lubrication points and blocking the flow of cylinder lubricating oil into the cylinder.
To ensure cylinder lubricating oil enters the cylinders when the piston is in the required position.
To ensure the correct amount of cylinder lubricating oil is fed into the cylinders.
To avoid excess pressure in the cylinder lubrication system.
Thermistors are temperature sensitive devices. A positive temperature coefficient thermistor will typically have:
Relatively linear characteristic.
Relatively non linear characteristic.
Is it always possible to use the word “ship” instead of the word “boat”?
A large vessel is always called a “ship” and never a “boat”.
Normally a small vessel is called a “boat” rather than a “ship”, otherwise it is not important.
Either can be used anytime.
A boat can only be used for vessels under 50 metres in length.
A mechanical seal, consisting of carbon and ceramic seal rings, is to be fitted to a centrifugal pump shaft. What is the most likely result of not being extremely careful when fitting this type of seal?
The seal rings are hard and may score the pump shaft.
The spring and bellows for the seal can be easily damaged.
The seal rings are brittle and can be easily chipped or damaged.
The rubber O rings for the seal can be easily damaged.
The circuit consists of two inductors, L(1) = 6 H and L(2) = 12 H, connected in parallel. Calculate the equivalent L(S) of the two inductors.
What is the disadvantage of using chemicals on an oil-spill on the water?
It is difficult to apply the chemicals if the oil drifts away from the ship’s side.
The chemicals make it difficult to remove the oil from the water.
It is difficult to apply chemicals if there is any wind.
The water gets a white colour, which makes it easy to detect the oil-spill.
What is the purpose of the ODME (Oil Discharge Monitoring Equipment) printer?
To prove that oil has been pumped overboard according to regulations.
To prove fault conditions in the ODME.
To prove that the ODME system has been used.
A seawater pump requires overhaul but there are no spare wear rings for the casing and impeller. It is decided that new wear rings will be fabricated onboard using the ship’s lathe. What would be the most suitable material to use to fabricate the rings onboard?
What is the expansion ratio of the foam produced by the fixed low-expansion foam fire-extinguishing system of an engine room?
Greater than 20 to 1 but less than 50 to 1.
What do you understand by: “Let go the port anchor?”
Let go the port anchor means: slacken the port anchor cable.
Let go the port anchor means: put the port windlass brake in gear.
Let go the port anchor means: put the port windlass brake in gear and lower the anchor.
Let go the port anchor means: open the port windlass brake.
Where would you find out which fire sections are enclosed by “A” or “B” class divisions on a ship?
All the mentioned alternatives.
On the general arrangement plan.
On the Ship’s fire control plans.
An earth fault exists on the blue line of a 100 A bilge pump circuit. A second earth fault occurs on the yellow line of a 10 A ventilation fan circuit. The likely outcome is that:
Both motors trip out on overload.
A short circuit occurs between earth faults and the ventilation fan fuse blows.
A short circuit occurs between earth fault and the bilge pump fuse blows.
An open circuit occurs between earth fault and both motors trip out.
Modern slow speed, two stroke diesel engines often have locating pins or pegs to keep the piston rings in a fixed position. Why is this arrangement used?
The piston ring gaps can be kept in line to control the gas pressure on each of the rings.
The piston rings are more difficult to lubricate because of the slow operating speeds and will wear more quickly if they are allowed to rotate.
It avoids the risk of the ends of the piston rings being forced out by the gas pressure and catching on the scavenge ports.
It ensures the rings cannot be mixed up and that they are fitted in the correct order on the piston.
What is the correct name of the tool shown in the illustration?
What is the correct name of the part highlighted in the illustration?
What is the most important task after carrying out any major overhaul on a diesel engine?
Start the engine to check the direction of rotation.
Repair any damaged paint work on the engine.
A thorough check inside the engine to make sure all tools and cleaning rags have been removed.
Start the auxiliary blower to ventilate the engine so that it has sufficient fresh air for starting.
A detector that is activated by a rise of temperature is:
Some large slow speed diesel engines have jack bolt arrangements for retaining the main bearing top keep in place rather than the more conventional stud bolts. How does this arrangement affect the maintenance and checking procedures for the tie rods on the engine?
The tie rods should be fully tensioned before the jacking bolts are loaded to avoid overload of the bearing caps and frame structure.
The tie rods and jacking bolts must be tightened simultaneously to avoid excess load on either component.
The jacking bolts should be fully loaded before the tie rods are tensioned to avoid excess loads on the tie rods.
It has no effect since the tie rods and jacking bolts have completely separate functions.
When referring to onboard oil treatments using a centrifuge, what is meant by the term purification?
Separation of solid contaminants from a liquid during the process.
Separation of two insoluble liquids with different densities, and the removal of solids in the same process.
It is a general term applied to a process for cleaning oil using a centrifuge.
Separation of one insoluble liquid from another.
Which of the options represents the best action to take when an item of machinery, which normally operates in automatic mode, is operated in “manual” mode?
Keep the Chief Engineer informed of machines performance on an hourly basis.
Have someone permanently stationed at the machine in case of an operational problem.
Monitor the operation of the machinery on a frequent basis.
Change over all other machinery to manual mode of operation.
A vapour compression refrigiration system is usually fitted with a number of devices to give protection and control of the system. Which of the methods given in the options should be used to test the high pressure cut out during routine maintenance and checking of the system?
Manually close each of the evaporator coils by switching off the electrical supply to the liquid line solenoid shut off valves and monitor the condenser pressure.
Close the condenser outlet valve and closely monitor the condenser pressure.
Gradually shut in the condenser cooling water valve or the condenser refrigerant inlet valve while closely monitoring the compressor discharge pressure.
Charge the system with refrigerant until the high pressure cut out operates.
With two alternators running in parallel, and one is to be disconnected. The first step is to:
Remove the load from the alternator to be stopped.
Increase the frequency on the switchboard.
Trip the main circuit breaker.
Make sure the load is evenly shared.
What do you understand by the order: “Move the pilot ladder to the other side?”
Move the pilot ladder to the other side, means: to move the pilot ladder further along nearer to the bow.
Move the pilot ladder to the other side, means: to rig another pilot ladder.
Move the pilot ladder to the other side, means: to change the position of the pilot ladder from the main deck to the fore deck.
Move the pilot ladder to the other side, means: to shift the pilot ladder to the opposite side of the ship.
What will be the probable outcome if the amplification is set too high on a controller?
The process will oscillate and get out of control.
The set-point will change.
The process response will be very slow.
What is the main effect on lubricating oil of operating for long periods at excessively high temperature?
It will cause the oil to oxiside, increasing the viscosity.
It will cause the oil to oxidise, reducing the viscosity.
It will cause the oil to evaporate, increasing consumption.
It will change the flashpoint of the oil.
An earth fault exists on the blue line of a 100 A bilge pump circuit. A second earth fault occurs on the yellow line of a 10 A ventilation fan circuit. Both systems are supplied from the ship’s 440 V supply. The likely outcome is that:
A short circuit occurs between earth faults and the ventilation fan fuse blows.
An open circuit occurs between earth fault and both motors trip out.
A short circuit occurs between earth fault and the bilge pump fuse blows.
Both motors trip out on overload.
The packed gland on a centrifugal pump is leaking even though the gland has been “nipped up”. What is the correct action to take to stop the leakage?
Tighten up the gland as much as possible until the leakage stops.
Ensure the bilge well to which the leakage is draining is regularly pumped out.
Re-pack the stuffing box loosely with the correct size packing at the earliest opportunity.
Fit an extra ring of oversize packing to the stuffing box at the earliest opportunity.
For ideal synchronising as the incomer circuit breaker contacts make, the phase angle difference between the incomer e. m. f. and the busbar voltage should be:
What is the correct name of the tool shown in the illustration?
A mechanical seal, consisting of carbon and ceramic seal rings, is to be fitted to a centrifugal pump shaft. What is the most likely result of not being extremely carefull when fitting this type of seal?
The spring and bellows for the seal can be easily damaged.
The rubber O rings for the seal can be easily damaged.
The seal rings are hard and may score the pump shaft.
The seal rings are brittle and can be easily chipped or damaged.
The responsibility for safety and security rests with everybody on board the vessel. General house-keeping rules should be followed. Which of the listed rules is the most important?
Do not carry lighters or matches when working outdoors.
Always use gloves when using grinding machines.
Keep tools within easy reach during work.
Keep your working area clean and tidy.
Which part of the crankshaft of a modern large two stroke diesel engine is most likely to be the origin point for crack initiation during service and therefore needs the greatest attention during maintenance inspection?
The dowel pins and dowel holes.
What is the period of validity of the Safety Management Certificate?
Why may wearing sweat rags slung round your neck when working in the machinery spaces be hazardous?
The rags may cause sweat rash.
The rags may cause you to get too hot and faint.
The rags may be soaked with oil and catch fire.
The rags may be caught by running machinery or power tools.
Under which circumstances should a sprinkler head of a common fixed sprinkler fire-extinguishing system be activated?
When the smoke density exceeds 12,5 % obscuration per minute, but after the corresponding alarm is acknowledged and assessed at the control panel.
When the temperature is within a range from 68 °C to 79 °C, but after the corresponding alarm is acknowledged and assessed at the control panel.
Automatically, when the temperature is within a range from 68 °C to 79 °C.
Automatically, when the smoke density exceeds 12,5 % obscuration per meter.
What type of construction material should be avoided regarding fire protection purposes? (SOLAS II-2/2.2.3).
All combustible materials.
All uncovered wooden materials.
Is it necessary to cool the samples taken from a diesel engine cooling water system before carrying out tests to determine the concentration of treatment chemicals?
No, the test should be carried out at system temperature.
Yes, the samples should be cooled to approximately 25 °C.
Yes, the samples should be cooled to approximately 50 °C.
No, the samples should be heated to approximately 95 °C.
Personnel in a high voltage switchroom smell ozone. Which of the following is the likely cause?
Air circuit breaker problems.
Arcing at badly connected bus bars.
Vacuum circuit breaker problems.
During maintenance of a piston rod stuffing box on a large, slow speed diesel engine it is usual to measure the butt gaps between the sealing ring and scrapper ring segments. What would be the effect of these gaps being too small?
If the gaps are too small the rings could scope the piston rod.
If the gaps are too small they could close due to the radial wear of the rings before the next scheduled overhaul preventing the rings from contacting the piston rod and sealing it.
If the gaps are too small then the flow of scavenge air through the gland would be reduced and the gland would overheat.
If the gaps were too small then no oil could pass up the piston rod to lubricate the sealing rings.
During maintenance work on a compensated mechanical hydraulic governor air is drawn in to the hydraulic circuit after draining and flushing out the unit. Which of the actions given in the options is most likely to assist in the removal of the air from the system?
With the governor in operation open the compensation needle valve to introduce instability and disturb the engine load to make the governor hunt.
Overfill the governor with fresh oil to force all of the air out.
Drain the governor again and slowly refill with fresh oil.
With the governor in operation close the compensation needle valve and disturb the load to make the engine hunt.
For a Nitrite – Borate based cooling water treatment system, what would be considered to be the normal nitrite concentration limits for a correctly dosed system?
3 000 – 4 500 ppm Nitrite.
1 500 – 3 000 ppm Nitrite.
4 500 – 6 000 ppm Nitrite.
When you join a new ship, how are you informed about safety rules, alarm instructions and your own duties in case of an emergency?
By folder distributed to each crewmember.
By muster list exhibited in conspicuous places.
By alarm instructions in all crew cabins.
By oral instructions by the Captain.
What is the main reason for keeping engine lubricating oil viscosity within recommended limits?
To reduce system pressure losses.
To ensure the strength of the oil film is sufficient to keep lubricated surfaces apart.
To neutralise any acids that may form.
PT-100 sensors are some times used with 3 or 4 wires. What is the reason for this?
Higher mechanical strength of the cable.
Because of power-consumption.
Higher measuring accuracy.
What is the correct name of the part highlighted in the illustration?
What is the correct name of the tool shown in the illustration?
What is the correct name of the part highlighted in the illustration?
While alongside at a repair berth a new section of seawater pipe has been fabricated in a shoreside workshop from drawings supplied by the vessel. During fitting of the pipe by ship’s engineers it is noted that the pipe is too short leaving a gap of about 8 mm between the flange faces. What action should be taken to remedy this problem?
The pipe should be returned to the shoreside workshop for modification or to be remade to the correct dimensions.
The ships engineer’s should use extra long bolts and pull the flanges together.
The ship’s engineers should fit extra thick joints between the flanges to fill the gap.
The ship’s engineers should manufacture a spacer piece to fit the gap.
Give the meaning of the following symbol:
Indicates manual starting direction of the engine.
During maintenance work on a main diesel engine the fuel injection valve is found to be jammed in the pocket in the cylinder cover. Which of the procedures given in the options should be followed in order to complete the work?
Wedge a bar between the piston top and the bottom of the injector and use the turning gear to force the injection valve out.
Replace the complete cylinder cover with a spare unit and land the cover with the jammed valve ashore for repair in a specialist workshop.
Remove the cylinder cover and try and drive the injection valve out of the pocket from the underside with a hammer and punch.
With the fuel injection valve retaining nuts removed admit compressed air into the engine cylinder to try and blow the injection valve out of the pocket.