Der Test besteht aus 80 zufälligen Fragen.
Gesamtzahl der Fragen zu diesem Thema: 120
The bones in the human body are connected to each other by:
Different type of joints.
Which of the options given is the main reason for using a ring spanner to tighten the brass nuts on the cover studs of a pump casing?
It can be adjusted to the exact size of the nut.
It will allow the nuts to be tightened correctly.
The nuts can be tightened more with this type of spanner.
It will minimise the risk of slipping off the nut or damaging the nuts.
Which of these are indicators that an individual may be a drug smuggler?
The individual makes small local purchases.
The individual is disinterested in the ship’s cargo.
The individual wears bulky or out of season clothing.
The individual spends his or her free time hanging out with others.
What are the lists called that give the position and task during a lifeboat drill for all persons on board the ship?
What could be the cause of a refrigeration compressor running continuously even though normal temperatures for the cold rooms have been reached?
Low-pressure cut-out is stuck in closed position.
The differential pressure switch for the lubricating oil pressure cut-out is stuck in the closed position.
High-pressure cut-out is stuck in open position.
Solenoid valve before the expansion valve stuck in closed position.
What is meant by the term “segregation”?
The process of electronically transferring the data on cargoes loaded on a vessel between the load port and the discharge port, such that import documentation is prepared in advance of the vessel’s arrival.
The stowage of cargoes when calculated by a computerized load program.
The planned, separated stowage of cargoes that may react dangerously with each other in the event of leakage or other damage.
The planned adjacent stowage of packaged goods, thereby confining a listed hazard within the same area of the ship.
What should be the first action to be taken in the event of the water level disappearing out of the boiler water level gauge glass?
Close the main steam stop valve.
Secure all of the burners.
Close the feed water stop valve.
An electric motor is to be aligned to a pump by insuring shims under the motor feet. Which of the tools given in the options would be used to check that the alignment is correct by measurement of the gap between the coupling faces?
An inside vernier calliper.
What is the “International shore connection” used for?
To connect the ship fire main to the shore lines.
To connect the cargo hoses to the shore.
To connect the bunker hoses to the shore.
To connect the ship fresh water hoses to the shore.
What is the signal actuated by a fire detection system?
A visual and audible alarm signal at the control panel.
An audible signal at the control panel.
A visual signal at the control panel.
An audible and visual signal consisting in 7 short signals followed by a long one.
With reference to the efficiency of cargo pumps on oil tankers, the abbreviation NPSH stands for:
Net Pressure Suction Head.
Necessary Pumping Suction Hazard.
Nominal Pressure Suction Head.
Natural Pumping Standard Height.
What is the capacity of the required portable fluid extinguishers?
Not more than 20 litres and not less than 12 litres.
Not more than 13,5 litres and not less than 9 litres.
An alarm signal consisting of seven short blast followed by one prolonged blast is sounded by the ship’s whistle and alarm bells. What are you to do?
Go to your lifeboat station.
Go to (or remain in) your cabin and await further orders.
Report on the bridge (deck crew) or engine room (engine crew) for further orders.
Hot work is to be carried out close to a smoke detector in the engine room. What precautions should be taken?
Notify Deck Officer and Engineer Officer in charge. The loop for the smoke detector should be isolated while work is done and normal precautions for hot work taken including permit to work.
Disconnect or cover up the smoke detector.
No special precautions except for having a watch man and a fire extinguisher available.
Notify Deck Officer in charge that a fire alarm may occur.
What is the minimum number of channels required for the portable two-way VHF’s for survival craft?
The responsibility for safety and security rests with everybody on board the vessel. General house-keeping rules should be followed. Which of the listed rules is the most important?
Always use gloves when using grinding machines.
Keep tools within easy reach during work.
Keep your working area clean and tidy.
Do not carry lighters or matches when working outdoors.
An engine room rating is given the task of retightening the flanges of a pipe that has been replaced in the engine room. Which of the following tightening procedures should be followed?
Gradually tighten all of the bolts working diagonally across and around the flange.
Start with the top bolt and fully tighten each in turn moving clockwise around the flange.
Start with the bottom bolt and partially tighten each bolt in turn working counter clockwise around the flange. Repeat to fully tighten.
Fully tighten each bolt in turn and work diagonally across and around the flanges.
Welding and burning are two operations which give the highest risk of a fire on board ship. Which of the following safety precautions may be regarded as the most important in order to minimise this particular risk?
The area where the welding is to take place and adjacent spaces to be cleaned and all unnecessary materials and objects to be removed.
Only holders of a welding certificate should be allowed to carry out welding or burning on board ships.
Only use electrodes from a well known manufacturer.
Electric welding plants should be controlled by a responsible engineer before use.
An airway should be used when:
The patient has stopped breathing.
The patient is unconscious.
The patient is breathing on his own but is doing so with great difficulty.
Patient has injury in the mouth.
An engine room rating is assisting in the maintenance of some of the valves on the low pressure steam range. Which packing material, from the options given, would be the best choice for repacking the gland of a low pressure steam valve?
Lead covered cotton packing.
How many rocket parachute flares are carried in each liferaft with SOLAS B pack?
In a refrigeration system what is the most likely cause of the compressor suction pressure being too law and causing the compressor to short cycle?
System overcharged with refrigerant.
Insufficient cooling water flow through the condenser.
Expansion valve stuck open.
System undercharged with refrigerant.
Which one of the listed requirements regarding the stowage of a survival craft corresponds to present SOLAS regulations? Each survival craft shall be stowed:
In a secure and sheltered position and protected from damage by fire or explosion.
Wherever space is available.
In a state of readiness so that two crew-members can prepare for embarkation and launching in less than 15 minutes.
On the starboard side of the ship.
Is there any special area where it is forbidden to pump out any sludge or oil residues?
There are 8 special area where it is forbidden to pump out any sludge or oil residues.
There are 9 special area where it is forbidden to pump out any sludge or oil residues.
There are 4 special area the Baltic, Mediterranean, Red sea and Black sea where it is forbidden to pump out any sludge or oil residues.
There isn’t any special area where it is forbidden to pump out any sludge or oil residues.
What is flashpoint of an oil or liquefied gas?
The flashpoint is the mixture of oxygen and hydro carbons needed to have an oil or liquefied gas to burn.
The flashpoint for an oil or liquefied gas is the temperature at which it is possible to ignite the vapour above the liquid.
The flashpoint is the temperature the oil or liquefied gas need for self ignition.
The flashpoint is the temperature needed to have a oil or liquefied gas pumpable.
What is the most suitable type of packing for a shaft gland of a pump used for seawater duties?
Lead covered hemp packing.
Mica impregnated cotton packing.
The engine room rating has been assisting with ballast operations during a period of engine room watch duty. Ballast operations have stopped for a couple of hours while stores are being taken. What action should the rating take during this break in operations?
Just keep the pumps running and the valves for the ballast tanks open to save time when operations are restarted. The tanks will just overflow through the air vents.
Just stop the pumps and close the pump suction and discharge valves. Leave the valves for the ballast tanks open to save time later.
Shut the valves for the ballast tanks but keep the pumps running and discharging overboard to save time later.
Stop all of the ballast pumps and close all of the ballast valves as soon as operations are stopped. Ballast lines should always be closed except when they are being used.
During cargo or bunker operations, oil response equipment is to be:
Used elsewhere in the ship.
The ship is involved in a collision, what is the immediate action by the Officer of the Watch after the incident has taken place?
Sound the General Alarm and stop engines.
Contact the other ship and send the bridge lookout down to start taking soundings.
Call the Master and check the position for any immediate dangers.
Stop engines and check over the side for any signs of pollution.
What is the first action that should be taken by the rating on boiler watch in the event of a flame failure on the boiler?
Call the engineer on watch.
Stop the feed water pump.
When cargo discharge reaches stripping levels on an oil tanker, it is necessary to reduce the inert gas pressure so as to:
Comply with the requirement of MARPOL Annex VI.
Avoid locking the cargo pump impeller.
Avoid over-capacity in the IG generator.
Shipboard Emergency Drills must be carried out at least (OPA-90):
The threads on the drain plug for the bronze end cover of a sea water cooled heat exchanger have been badly damaged during maintenance. There is no spare brass plug available. What is the best solution for repairing the heat exchanger?
Make a new brass plug on the lathe to fit the drain hole.
Use a steel plug with the same thread as the original to replace it.
Wrap the threats in thread tape and coat it with jointing compound before refitting it.
Hammer in a wooden tapered plug as a temporary repair.
An engine room rating is assisting the duty engineer during a period of UMS operation. After completing the tasks they have been busy with the engineer and rating leave the engine room which is returned to UMS mode. The rating realises that an oil tank filling valve has been left open. What action should be taken?
Inform the duty engineer immediately so that the engine room can be re-entered and the valve can be shut.
Inform another crewmember that he is going back into the engine room to close the valve.
Just leave the valve open as it is unsafe to enter the engine room alone. The high alarm will sound to notify the engineer when the tank is full.
Re-enter the engine room straight away and shut the valve.
Which of the methods given in the options should be used to test a remote reading temperature gauge for the auxiliary boiler exhaust gas?
Check the resistance change in the sensor over a known temperature range against the resistance values in the product sheet.
Fit a spare temperature gauge and see if the reading are the same.
Place the sensor in a test tank of water fitted with a heater element and thermometer and check the temperature gauge at different temperatures.
Place the sensor in a test tank of oil fitted with a heater element and thermometer and check the temperature gauge at different temperatures.
In carbon dioxide fire-fighting systems for use in machinery spaces the fixed piping system shall be such that:
85 % of the gas can be discharged into the space within 2 minutes.
100 % of the gas can be discharged into the space within 2 minutes.
100 % of the gas can be discharged into the space within 3 minutes.
70 % of the gas can be discharged into the space within 1 minute.
The insulation resistance (IR) to earth of a new galley hot-plate is measured to be 30 Mohm. When three identical hot-plates on the same supply are tested together their combined IR will be:
Which of the following areas may be possible restricted areas? Review all answers.
Which cleaning agents are suitable for use in machinery space when considering the effect on the function of the oily water separator?
Only non-emulsifying cleaning agents with self-splitting emulsifiers are suitable.
None should be used as all cleaning agents affect the function of an OWS.
Any kind of cleaning agent is suitable.
An emulsification type cleaning agent is suitable.
Is it necessary to cool the samples taken from a diesel engine cooling water system before carrying out tests to determine the concentration of treatment chemicals?
No, the samples should be heated to approximately 95 °C.
Yes, the samples should be cooled to approximately 25 °C.
Yes, the samples should be cooled to approximately 50 °C.
No, the test should be carried out at system temperature.
What would be the most probable cause of the exhaust gas temperature from one cylinder of a diesel engine being lower than normal?
The opening pressure for the injection valve for the cylinder is set too high.
There is air in the fuel oil system.
The camshaft chain is too slack.
The intake filter for turbo charger is partly fouled.
With reference to the efficiency of cargo pumps on oil tankers, the abbreviation NPSH stands for:
Necessary Pumping Suction Hazard.
Natural Pumping Standard Height.
Nominal Pressure Suction Head.
Net Pressure Suction Head.
What kind of extinguishing-remedy would you choose to put out an electrical fire?
Combination of powder and water.
Dry extinguishing remedy.
An engine room rating notices that the guard on a running pump is hanging loose due to a missing bolt on the support bracket and it is catching the shaft coupling. What is the best action to take as a repair method?
Try and fit a new bolt while the pump is running to permanently fix the guard in place.
Inform the watchkeeper so that the pump can be stopped and a new bolt can be fitted to permanently fix the guard in place.
Fasten the guard back in place with a piece of rope with the pump running as a temporary repair.
Place a sheet of metal in front of the guard to deflect any parts that may fly off as a temporary repair.
What special equipment can often provide assistance in locating a survival craft or man overboard and in the water?
A sectored search pattern.
What kind of measure is the division of the vessel in upright areas by using thermic and structural separations?
It is both a prevention and protection measure.
It is a protection measure.
It is a prevention measure.
It is neither a prevention nor a protection measure.
While assisting the watchkeeper with routine cleaning of the fuel oil separator the watch rating is requested to clean the plate stack. Which of the options given is the preferred method for such a task?
Soak the dirty plates in a solvent for an hour and then stand them on the engine room deck to drain off.
Scrape the plates as clean as possible with a packing knife and then wash them with a high pressure water hose.
With the plate stack in position fill the purifier bowl with clean diesel oil and quickly switch it on and off to wash the plates.
Soak the plates in a suitable solvent until all of the dirt has loosened off and wipe clean with rags.
What type of fire integrity must be provided for an engine control room?
During maintenance work in the engine room or on deck it is often necessary to work aloft (work at a height above the plates or the deck). When working aloft onboard the ship what is the most important safety precaution that should be taken?
Wear a safety harness securely attached to ship’s structure.
Wear a safety helmet and goggles.
Lash the bottom of the ladder to a fixed point.
Keep all the tools required for the work in a bucket.
How much liferaft capacity should be provided on a conventional cargo ship of more than 85 meters in length?
100 % of the complement if it can be readily launched on either side of the ship. If it cannot be readily launched on either side, 100 % must be provided on each side.
50 % of the complement on each side of the ship.
75 % of the complement on each side of the ship.
25 % of the complement on each side of the ship.
What is the best way to avoid pollution from small oil-spills aboard a ship?
Contain any oil-spill onboard the ship.
Rig an oil boom around the ship.
Have sawdust ready for use.
Have dispersing chemicals ready for use in case of oil-spill.
Personal protection equipment appropriate to the task should be worn during work in the engine room. Which of the tasks given in the options requires that safety goggles should always be worn?
When you are working with power tools or chemicals.
When you are filling in the engine room log book.
When you are tidying up in the engine room workshop.
During an oil cargo discharging operation, the IG supply to the tanks fails. As an OOW you would:
Continue discharging with the cargo pumps running at minimum speed, and inform the engine room.
Slow down and relieve the vacuum by opening the tanks lids and inform the Chief Officer.
Activate the inert fans and blow fresh air into the cargo tanks, and inform the terminal authority.
Immediately stop the discharging and inform the Chief Officer.
What signal, if any, is specified in SOLAS as the “Abandon ship” signal?
Six short blasts followed by one long blast.
The “Abandon ship” signal is not specified, only the general emergency alarm signal is stated.
Seven short blasts followed by one long blast.
When shutting down the flue gas plant, the last step that the operator shall carry out would be to:
Close the deck isolating valve.
Open ventilation valve to atmosphere.
Close the gas pressure control valve.
Shut down of inert gas blower.
The purpose of having corrugations in the bulkheads of cargo tanks of an oil tanker is to:
Provide strength, but with clean and clear surfaces within the tank.
To assist in the drainage of the oil by funneling the oil to the suction well.
Reduce the effects of Free Surface within the vessel.
Provide additional resistance to shear forces and bending moments.
For how long should the self contained air support system on a totally enclosed lifeboat having its engine running be capable of providing safe and breathable air?
Which of the following answers would most appropriately describe shell plating damage to the vessel?
My vessel has sustained damage to shell plating below the waterline.
My vessel has sustained damage to shell plating below the waterline in way of No. 3 cargo hold, starboard side.
My vessel has sustained damage to shell plating in way of No. 3 cargo hold.
My vessel has sustained damage to shell plating above the waterline.
What do you understand by the order: “Move the pilot ladder to the other side”?
To shift the pilot ladder to the opposite side of the ship.
To move the pilot ladder further along nearer to the bow.
To change the position of the pilot ladder from the main deck to the fore deck.
To rig another pilot ladder.
What is the correct name of the part highlighted in the sketch?
Cylinder air start valve.
What is the emergency channel on VHF?
What measures should be taken when handling mail?
Open any mail that looks suspicious.
X-ray or scan parcels before opening them.
Wear rubber gloves and protective clothing when opening suspicious looking mail.
Tear open letters with your hands.
An electric motor is to be aligned to a pump by insuring shims under the motor feet. Which of the tools given in the options would be used to check that the alignment is correct by measurement of the gap between the coupling faces?
An inside vernier calliper.
What would you do if you are told to operate a piece of mechanical equipment which you are not familiar with?
Seek advice from your superior before attempting to operate it.
Ensure that all safety guards and devices are disconnected.
Try and guess how the equipment should be operated.
Ignore the request to operate the equipment.
The examples of Aromatic Hydrocarbons will include:
Benzene, Toluene and Xylene.
Hydrogen Sulphide and Carbon Monoxide.
Carbon Dioxide and Hydrogen Peroxide.
Propane, Butane and Pentane.
A small electric motor needs to be taken to the bottom plates for fitting to a domestic water pump. It is only just too heavy to be manually carried so is to be lowered using the engine room crane. Which of the options given would be a suitable strop to use for the operation?
Any certified strop which has a safe working load greater than the weight of the motor.
A wire strop which is rated for twice the required load but is out of certification.
Any piece of rope will do as the motor is only just too heavy to carry.
Any strop which looks big enough to carry the load.
Where would you find out which fire sections are enclosed by “A” or “B” class divisions on a ship?
On the ship’s fire control plans.
On the general arrangement plan.
All the mentioned alternatives.
An engine room rating is assisting in the maintenance of some of the valves on the low pressure steam range. Which packing material, from the options given, would be the best choice for repacking the gland of a low pressure steam valve?
Lead covered cotton packing.
An important quantity which is useful in circuit analysis is known as conductance G (Siemens). Which of the formulas A to D expresses the conductance for this circuit?
You have abandoned ship in a liferaft. In most cases, which of the following actions should you generally take?
Organise a lookout system. Join up with other survival craft if possible. Stream the sea anchor.
Organise a lookout system.
Join up with any other survival craft and stream the sea anchor.
Start paddling in the direction of the nearest land.
Why should boiler sootblowers normally only be operated in the correct sequence?
To ensure soot is cleared progressively from the bottom tubes to the top and toward the boiler uptakes.
To minimise loss of steam pressure.
So that the operator does not forget which sootblowers have been used.
To avoid excess stress in the boiler.
The small amounts of cargo found in the cargo tanks before loading is referred to as OBQ, which means:
OPB (Observed Preliminary Volume).
TSV (Total Surveyed Volume).
ROB (Remaining On Board).
During maintenance of a pneumatically operated, diaphragm actuated control valve the diaphragm is found to be split. Select, from the options given, a suitable material to use to make a temporary replacement if there is no spare diaphragm available.
Natural rubber sheet of approximately the same thickness and elasticity as the original diaphragm material.
Cotton reinforced rubber insertion sheet of smaller thickness but similar strength as the original diaphragm material.
Natural rubber sheet of greater thickness and lower elasticity as the original diaphragm material.
Cotton reinforced rubber insertion sheet of approximately the same thickness but less elasticity than the original diaphragm material.
A seawater pipe is holed due to corrosion causing frequent bilge alarms. Which of the given temporary repair methods would be the preferred option to remedy the problem until the pipe can be replaced?
Cover the hole with rubber insertion held in place with a jubilee clip.
Cover all of the affected area with fibre glass tape and resin/fibre.
Wrap duct tape around the pipe in way of the hole.
Drive a steel taper pin into the hole to seal it.
What types of fire extinguishers shall be used in the engine room?
Fire extinguishers of the handy-size types only.
Fire extinguishers filled with fresh water only.
Fire extinguishers equipped for powder or CO2 only.
Any fire extinguisher with a weight of less than 100 lbs.
What is the most likely cause of black smoke at the boiler exhaust during normal operation of a steam boiler?
Insufficient combustion air.
Fuel oil temperature too high.
What is generally considered as the minimum safe time period before opening a crankcase door after the oil mist detector alarm has activated and the engine has been stopped?
After at least 20 minutes.
After at least 10 minutes.
After at least 5 minutes.
Welding and burning are two operations which give the highest risk of a fire on board ship. Which of the following safety precautions may be regarded as the most important in order to minimise this particular risk?
The area where the welding is to take place and adjacent spaces to be cleaned and all unnecessary materials and objects to be removed.
Only holders of a welding certificate should be allowed to carry out welding or burning on board ships.
Only use electrodes from a well known manufacturer.
Electric welding plants should be controlled by a responsible engineer before use.
When operating a propulsion installation consisting of medium speed diesel engines driving a controllable pitch propeller it is possible to operate the combination of engine speed and propeller pitch in a number of different ways. What would be the main reason for operating with constant speed and variable pitch?
To allow the engine to be operated with a load sensing governor instead of a speed sensing governor.
To allow rapid load change and thrust reversal when manoeuvring.
To obtain maximum propeller efficiency over the load range of the engine.
To allow constant speed operation of a shaft generator while the engine load changes with pitch variation.
During inspection of a high pressure fuel pump for a medium speed diesel engine it is observed that the upper leading edge and the lower helical edge of the pump plunger have suffered from erosion damage. Select the correct action to take to remedy this from the options given.
Renew only the plunger if the barrel appears undamaged.
Renew the plunger and barrel insert as a pair.
Smooth away the damaged area with a grinder and polishing stone and refit it.
Replace the complete pump with a new or reconditioned spare.