What could be the cause of a refrigeration compressor running continuously even though normal temperatures for the cold rooms have been reached?
Low-pressure cut-out is stuck in closed position.
The differential pressure switch for the lubricating oil pressure cut-out is stuck in the closed position.
High-pressure cut-out is stuck in open position.
Solenoid valve before the expansion valve stuck in closed position.
What do you call the method used for bone-soft part injuries?
What does the word “pyrotechnics” mean?
Pyrotechnics are the items which are capable of self-contained chemical reactions for the production heat, light, smoke and/or sound.
Pyrotechnics are items that are used to produce technical solutions to the complex problems.
Pyrotechnics are used to ensure that the correct technical proportions are used to start the system functioning.
Pyrotechnics is a group word to cover all the required activities in the event of a man overboard.
An engine room rating notices that the guard on a running pump is hanging loose due to a missing bolt on the support bracket and it is catching the shaft coupling. What is the best action to take as a repair method?
Try and fit a new bolt while the pump is running to permanently fix the guard in place.
Inform the watchkeeper so that the pump can be stopped and a new bolt can be fitted to permanently fix the guard in place.
Fasten the guard back in place with a piece of rope with the pump running as a temporary repair.
Place a sheet of metal in front of the guard to deflect any parts that may fly off as a temporary repair.
As per international regulations, the minimum inert gas pressure required to be maintained in slop tanks if slops are retained on board is:
What method shall be used when hauling survivors out of the sea (state of survivors is critical)?
An important quantity which is useful in circuit analysis is known as conductance G (Siemens). Which of the formulas A to D expresses the conductance for this circuit?
What would be the effects of a ship passing into shallow waters?
The vessel has a tendency to swing to port with a single fixed-pitch right-hand turning propeller.
The speed is not affected, but more rudder is required to steer the ship.
There is no noticeable difference in performance of the ship.
The ship is less responsive to both rudder and propeller.
What types of fire extinguishers shall be used in the engine room?
Fire extinguishers of the handy-size types only.
Fire extinguishers filled with fresh water only.
Fire extinguishers equipped for powder or CO2 only.
Any fire extinguisher with a weight of less than 100 lbs.
Unfortunately an insect has become lodged in the ear. How to remove the insect?
By using rubber vacuum pump and suck the foreign body out.
Hold one hand across your nose and blow hard. Since the nose-channel is closed, the air will escape through the ears instead. And so will the foreign body.
Gently flood the casualty’s ear with terpid water so that the insect will float out.
By using a Q-tip and carefully try to get the insect out.
The insulation resistance (IR) to earth of a new galley hot-plate is measured to be 30 Mohm. When three identical hot-plates on the same supply are tested together their combined IR will be:
Hot work is to be carried out close to a smoke detector in the engine room. What precautions should be taken?
Notify Deck Officer and Engineer Officer in charge. The loop for the smoke detector should be isolated while work is done and normal precautions for hot work taken including permit to work.
Disconnect or cover up the smoke detector.
No special precautions except for having a watch man and a fire extinguisher available.
Notify Deck Officer in charge that a fire alarm may occur.
What will a cadet find in the maintenance manual?
A cadet will find a lubricating chart in the maintenance manual.
A cadet will find grease in the maintenance manual.
A cadet will find machinery spare parts in the maintenance manual.
A cadet will find grease nipples in the maintenance manual.
During inspection of a high pressure fuel pump for a medium speed diesel engine it is observed that the upper leading edge and the lower helical edge of the pump plunger have suffered from erosion damage. Select the correct action to take to remedy this from the options given.
Renew only the plunger if the barrel appears undamaged.
Renew the plunger and barrel insert as a pair.
Smooth away the damaged area with a grinder and polishing stone and refit it.
Replace the complete pump with a new or reconditioned spare.
The engine room rating has been assisting with ballast operations during a period of engine room watch duty. Ballast operations have stopped for a couple of hours while stores are being taken. What action should the rating take during this break in operations?
Just keep the pumps running and the valves for the ballast tanks open to save time when operations are restarted. The tanks will just overflow through the air vents.
Just stop the pumps and close the pump suction and discharge valves. Leave the valves for the ballast tanks open to save time later.
Shut the valves for the ballast tanks but keep the pumps running and discharging overboard to save time later.
Stop all of the ballast pumps and close all of the ballast valves as soon as operations are stopped. Ballast lines should always be closed except when they are being used.
What is the signal actuated by a fire detection system?
A visual and audible alarm signal at the control panel.
An audible signal at the control panel.
A visual signal at the control panel.
An audible and visual signal consisting in 7 short signals followed by a long one.
During an oil cargo discharging operation, the IG supply to the tanks fails. As an OOW you would:
Continue discharging with the cargo pumps running at minimum speed, and inform the engine room.
Slow down and relieve the vacuum by opening the tanks lids and inform the Chief Officer.
Activate the inert fans and blow fresh air into the cargo tanks, and inform the terminal authority.
Immediately stop the discharging and inform the Chief Officer.
What is the emergency frequency of MF (Medium Frequency) radio?
The responsibility for safety and security rests with everybody on board the vessel. General house-keeping rules should be followed. Which of the listed rules is the most important?
Always use gloves when using grinding machines.
Keep tools within easy reach during work.
Keep your working area clean and tidy.
Do not carry lighters or matches when working outdoors.
What is the most suitable type of packing for a shaft gland of a pump used for seawater duties?
Lead covered hemp packing.
Mica impregnated cotton packing.
Is there any special area where it is forbidden to pump out any sludge or oil residues?
There are 8 special area where it is forbidden to pump out any sludge or oil residues.
There are 9 special area where it is forbidden to pump out any sludge or oil residues.
There are 4 special area the Baltic, Mediterranean, Red sea and Black sea where it is forbidden to pump out any sludge or oil residues.
There isn’t any special area where it is forbidden to pump out any sludge or oil residues.
When shutting down the flue gas plant, the last step that the operator shall carry out would be to:
Shut down of inert gas blower.
Close the gas pressure control valve.
Close the deck isolating valve.
Open ventilation valve to atmosphere.
When cargo discharge reaches stripping levels on an oil tanker, it is necessary to reduce the inert gas pressure so as to:
Comply with the requirement of MARPOL Annex VI.
Avoid locking the cargo pump impeller.
Avoid over-capacity in the IG generator.
What would be the most probable cause of the exhaust gas temperature from one cylinder of a diesel engine being lower than normal?
The opening pressure for the injection valve for the cylinder is set too high.
There is air in the fuel oil system.
The camshaft chain is too slack.
The intake filter for turbo charger is partly fouled.
After checked for open airway, given the first two inflations and checked the pulse to make sure that the heart is beating, what is the rate of inflations given until natural breathing is restored?
Doesn’t matter how many times.
When shutting down the flue gas plant, the last step that the operator shall carry out would be to:
Close the deck isolating valve.
Open ventilation valve to atmosphere.
Close the gas pressure control valve.
Shut down of inert gas blower.
What is flashpoint of an oil or liquefied gas?
The flashpoint is the mixture of oxygen and hydro carbons needed to have an oil or liquefied gas to burn.
The flashpoint for an oil or liquefied gas is the temperature at which it is possible to ignite the vapour above the liquid.
The flashpoint is the temperature the oil or liquefied gas need for self ignition.
The flashpoint is the temperature needed to have a oil or liquefied gas pumpable.
Why should boiler sootblowers normally only be operated in the correct sequence?
To ensure soot is cleared progressively from the bottom tubes to the top and toward the boiler uptakes.
To minimise loss of steam pressure.
So that the operator does not forget which sootblowers have been used.
To avoid excess stress in the boiler.
The bones in the human body are connected to each other by:
Different type of joints.
What is the emergency channel on VHF?
What would be the most probable cause of high temperature readings for the bearings in a diesel engine?
Lubricating oil pressure too low.
Charge air pressure too low.
Jacket cooling water temperature too high.
A small electric motor needs to be taken to the bottom plates for fitting to a domestic water pump. It is only just too heavy to be manually carried so is to be lowered using the engine room crane. Which of the options given would be a suitable strop to use for the operation?
Any certified strop which has a safe working load greater than the weight of the motor.
A wire strop which is rated for twice the required load but is out of certification.
Any piece of rope will do as the motor is only just too heavy to carry.
Any strop which looks big enough to carry the load.
What are the lists called that give the position and task during a lifeboat drill for all persons on board the ship?
How many rocket parachute flares are carried in each liferaft with SOLAS B pack?
Personal protection equipment appropriate to the task should be worn during work in the engine room. Which of the tasks given in the options requires that safety goggles should always be worn?
When you are working with power tools or chemicals.
When you are filling in the engine room log book.
When you are tidying up in the engine room workshop.
What is the correct understanding of the term “Lapse Rate” when used in Meteorology?
The rate of increase of the wind associated with a Tropical Revolving Storm.
The delay in temperature reduction associated with the wet bulb thermometer of a hygrometer.
The change in the temperature associated with the passing of the warm front of a frontal depression.
The change of the temperature in the atmosphere with height above sea level.
What is the first thing that should be checked when taking over a boiler watch?
The boiler room bilge level.
The oil pressure to the burner.
The boiler exhaust gas colour.
What is meant by the term “segregation”?
The process of electronically transferring the data on cargoes loaded on a vessel between the load port and the discharge port, such that import documentation is prepared in advance of the vessel’s arrival.
The stowage of cargoes when calculated by a computerized load program.
The planned, separated stowage of cargoes that may react dangerously with each other in the event of leakage or other damage.
The planned adjacent stowage of packaged goods, thereby confining a listed hazard within the same area of the ship.
What kind of extinguishing-remedy would you choose to put out an electrical fire?
Combination of powder and water.
Dry extinguishing remedy.
An engine room rating is assisting in the maintenance of some of the valves on the low pressure steam range. Which packing material, from the options given, would be the best choice for repacking the gland of a low pressure steam valve?
Lead covered cotton packing.
What is the most likely cause of black smoke at the boiler exhaust during normal operation of a steam boiler?
Insufficient combustion air.
Fuel oil temperature too high.
Is it necessary to cool the samples taken from a diesel engine cooling water system before carrying out tests to determine the concentration of treatment chemicals?
No, the samples should be heated to approximately 95 °C.
Yes, the samples should be cooled to approximately 25 °C.
Yes, the samples should be cooled to approximately 50 °C.
No, the test should be carried out at system temperature.
During maintenance work in the engine room or on deck it is often necessary to work aloft (work at a height above the plates or the deck). When working aloft onboard the ship what is the most important safety precaution that should be taken?
Wear a safety harness securely attached to ship’s structure.
Wear a safety helmet and goggles.
Lash the bottom of the ladder to a fixed point.
Keep all the tools required for the work in a bucket.
What is the main purpose for taking diesel engine crankshaft deflections?
To allow calculation of the load on each of the bearings.
To check for weardown of the bottom end bearings.
To check that the shafting is in a straight line.
To check for weardown of the main bearings.
If the flow of gas to shore reaches the maximum declared capacity whilst using the Vapour Emission Control System (VECS), the OOW should:
Say nothing and hope notices, so that loading is completed as soon as possible.
Reset the lifting pressure level on the Pressure/Vacuum valves to allow them to release more vapour to atmosphere.
Open the mast riser vents to relieve the excess pressure and bring the flow within the declared range.
Request the terminal to reduce the loading rate until the flow of gas to shore is controlled.
What action should be taken if it is noticed that there is a quantity of oil on the engine room tank top?
Start the fire pump and wash the oil into the bilges.
Open the overboard valve and start the bilge pump.
Apply foam to the tank top to minimise any risk of fire.
Notify the duty engineer and try and find the cause of the leakage so that it can be stopped and the oil cleaned up.
While getting tools ready and preparing for overhaul work on the main engine the engine room rating notices that the electrical extension is damaged. A small section of the cables outer insulation is split although the inner insulation appears ok. What action should the rating take?
Cut off the end of the cable including the damaged section and refit the plug to the end of the remaining cable before using the extension.
Label the damaged extension as unfit for use and return it to the store for testing and get a replacement extension.
Carry on using the extension after wrapping insulation tape over the damaged section as it is only minor damage.
Just use the extension as it is since the damage is only to the outer insulation and the inner insulation appears ok.
Which one of the listed requirements regarding the stowage of a survival craft corresponds to present SOLAS regulations? Each survival craft shall be stowed:
In a secure and sheltered position and protected from damage by fire or explosion.
Wherever space is available.
In a state of readiness so that two crew-members can prepare for embarkation and launching in less than 15 minutes.
On the starboard side of the ship.
During maintenance of a pneumatically operated, diaphragm actuated control valve the diaphragm is found to be split. Select, from the options given, a suitable material to use to make a temporary replacement if there is no spare diaphragm available.
Natural rubber sheet of approximately the same thickness and elasticity as the original diaphragm material.
Cotton reinforced rubber insertion sheet of smaller thickness but similar strength as the original diaphragm material.
Natural rubber sheet of greater thickness and lower elasticity as the original diaphragm material.
Cotton reinforced rubber insertion sheet of approximately the same thickness but less elasticity than the original diaphragm material.
Welding and burning are two operations which give the highest risk of a fire on board ship. Which of the following safety precautions may be regarded as the most important in order to minimise this particular risk?
The area where the welding is to take place and adjacent spaces to be cleaned and all unnecessary materials and objects to be removed.
Only holders of a welding certificate should be allowed to carry out welding or burning on board ships.
Only use electrodes from a well known manufacturer.
Electric welding plants should be controlled by a responsible engineer before use.
What would you do if you are told to operate a piece of mechanical equipment which you are not familiar with?
Seek advice from your superior before attempting to operate it.
Ensure that all safety guards and devices are disconnected.
Try and guess how the equipment should be operated.
Ignore the request to operate the equipment.
What is the correct name of the part highlighted in the sketch?
Cylinder air start valve.
During cargo or bunker operations, oil response equipment is to be:
Used elsewhere in the ship.
Shipboard Emergency Drills must be carried out at least (OPA-90):
An engine room rating is given the task of retightening the flanges of a pipe that has been replaced in the engine room. Which of the following tightening procedures should be followed?
Gradually tighten all of the bolts working diagonally across and around the flange.
Start with the top bolt and fully tighten each in turn moving clockwise around the flange.
Start with the bottom bolt and partially tighten each bolt in turn working counter clockwise around the flange. Repeat to fully tighten.
Fully tighten each bolt in turn and work diagonally across and around the flanges.
What special equipment can often provide assistance in locating a survival craft or man overboard and in the water?
A sectored search pattern.
A seawater pipe is holed due to corrosion causing frequent bilge alarms. Which of the given temporary repair methods would be the preferred option to remedy the problem until the pipe can be replaced?
Cover the hole with rubber insertion held in place with a jubilee clip.
Cover all of the affected area with fibre glass tape and resin/fibre.
Wrap duct tape around the pipe in way of the hole.
Drive a steel taper pin into the hole to seal it.
Which of the following answers would most appropriately describe shell plating damage to the vessel?
My vessel has sustained damage to shell plating below the waterline.
My vessel has sustained damage to shell plating below the waterline in way of No. 3 cargo hold, starboard side.
My vessel has sustained damage to shell plating in way of No. 3 cargo hold.
My vessel has sustained damage to shell plating above the waterline.
What signal, if any, is specified in SOLAS as the “Abandon ship” signal?
Six short blasts followed by one long blast.
The “Abandon ship” signal is not specified, only the general emergency alarm signal is stated.
Seven short blasts followed by one long blast.
What type of fire integrity must be provided for an engine control room?
What is the minimum number of channels required for the portable two-way VHF’s for survival craft?
What is the best way to avoid pollution from small oil-spills aboard a ship?
Contain any oil-spill onboard the ship.
Rig an oil boom around the ship.
Have sawdust ready for use.
Have dispersing chemicals ready for use in case of oil-spill.
What is the capacity of the required portable fluid extinguishers?
Not more than 20 litres and not less than 12 litres.
Not more than 13,5 litres and not less than 9 litres.
An engine room rating is assisting the duty engineer during a period of UMS operation. After completing the tasks they have been busy with the engineer and rating leave the engine room which is returned to UMS mode. The rating realises that an oil tank filling valve has been left open. What action should be taken?
Inform the duty engineer immediately so that the engine room can be re-entered and the valve can be shut.
Inform another crewmember that he is going back into the engine room to close the valve.
Just leave the valve open as it is unsafe to enter the engine room alone. The high alarm will sound to notify the engineer when the tank is full.
Re-enter the engine room straight away and shut the valve.
A detector that is activated by a rise of temperature is:
The small amounts of cargo found in the cargo tanks before loading is referred to as OBQ, which means:
OPB (Observed Preliminary Volume).
TSV (Total Surveyed Volume).
ROB (Remaining On Board).
An electric motor is to be aligned to a pump by insuring shims under the motor feet. Which of the tools given in the options would be used to check that the alignment is correct by measurement of the gap between the coupling faces?
An inside vernier calliper.
An electric motor is to be aligned to a pump by insuring shims under the motor feet. Which of the tools given in the options would be used to check that the alignment is correct by measurement of the gap between the coupling faces?
An inside vernier calliper.
What is the first action that should be taken by the rating on boiler watch in the event of a flame failure on the boiler?
Call the engineer on watch.
Stop the feed water pump.
What is generally considered as the minimum safe time period before opening a crankcase door after the oil mist detector alarm has activated and the engine has been stopped?
After at least 20 minutes.
After at least 10 minutes.
After at least 5 minutes.
Which of the following areas may be possible restricted areas? Review all answers.
The threads on the drain plug for the bronze end cover of a sea water cooled heat exchanger have been badly damaged during maintenance. There is no spare brass plug available. What is the best solution for repairing the heat exchanger?
Make a new brass plug on the lathe to fit the drain hole.
Use a steel plug with the same thread as the original to replace it.
Wrap the threats in thread tape and coat it with jointing compound before refitting it.
Hammer in a wooden tapered plug as a temporary repair.
Which of the methods given in the options should be used to test a remote reading temperature gauge for the auxiliary boiler exhaust gas?
Check the resistance change in the sensor over a known temperature range against the resistance values in the product sheet.
Fit a spare temperature gauge and see if the reading are the same.
Place the sensor in a test tank of water fitted with a heater element and thermometer and check the temperature gauge at different temperatures.
Place the sensor in a test tank of oil fitted with a heater element and thermometer and check the temperature gauge at different temperatures.
What is the correct name of the equipment shown in the sketch?
On a fire patrol at night you see smoke coming from a closed cabin door. What action should you take first?
Activate the nearest fire alarm button and advise bridge of the location of the fire.
Get the nearest fire extinguisher and then open the door to see what the situation is.
Take a look inside the cabin to see what the situation is.
As most people are sleeping, call a friend and ask him to assist in putting out the fire.
The purpose of the demister unit within the Inert Gas System is:
To remove sulphur oxides.
To remove water from the IGS stream.
While assisting the watchkeeper with routine cleaning of the fuel oil separator the watch rating is requested to clean the plate stack. Which of the options given is the preferred method for such a task?
Soak the dirty plates in a solvent for an hour and then stand them on the engine room deck to drain off.
Scrape the plates as clean as possible with a packing knife and then wash them with a high pressure water hose.
With the plate stack in position fill the purifier bowl with clean diesel oil and quickly switch it on and off to wash the plates.
Soak the plates in a suitable solvent until all of the dirt has loosened off and wipe clean with rags.
What are the lists called that give the position and task during a lifeboat drill for all persons on board the ship?
When operating a propulsion installation consisting of medium speed diesel engines driving a controllable pitch propeller it is possible to operate the combination of engine speed and propeller pitch in a number of different ways. What would be the main reason for operating with constant speed and variable pitch?
To allow the engine to be operated with a load sensing governor instead of a speed sensing governor.
To allow rapid load change and thrust reversal when manoeuvring.
To obtain maximum propeller efficiency over the load range of the engine.
To allow constant speed operation of a shaft generator while the engine load changes with pitch variation.
The normal carbon content of Crude Oil is in the range of: