A cleaning and repair job is to be done in a tank. The tank is heavily framed, of an awkward shape, with several distinct sections and built over and around a number of other storage tanks. Access lids and ventilation pipes are all at the forward end of the tank. How can it be ensured that the conditions in the area of the repair are fully checked? Select the ONE correct answer:
Ваша відповідь правильна:
Assess and plan for an initial entry, carry out further assessment within the space and then plan the entry for the repair on the basis of the additional information obtained.