A bulk carrier is loading to complete on summer draught of 10,00 m when in salt water; the vessel is loading in river water; The dock water allowance is 80 mm; The maximum draught when loading is completed is:
Correct answer:
10,08 metres.Your Answer:
10,80 metres.