A piston rod retaining nut needs to be tightened during maintenance on the main engine. Which of the given methods should be used to ensure it does not come loose in service?
Tighten it as tight as possible using a flogging spanner and a hammer.
Tighten it 10 % more than the manufacturer’s recommendation using a torque wrench.
Tighten it to the manufacturer’s recommendations using a torque wrench.
Tighten it as tight as possible using a spanner and extension pipe.
Give the meaning of the following symbol:
Indicates manual starting direction of the engine.
What precautions should be taken, in addition to shutting the main air start valve if work is to be carried out inside the main diesel engine crankcase?
Keep a man posted in the control room to stop anyone who tries to start the engine.
Engage the turning gear and put a notice at each engine control position.
Engage the turning gear, stop the starting air compressors and drain the air receivers.
Engage the turning gear and close every valve on the starting air receivers.
Which of the following fittings shall be provided to all lifeboats?
A manually controlled lamp fitted on the outside.
A remotely operated steering arrangement.
An electric power starting system for the propulsion engine with one rechargeable energy source.
Permanent boarding arrangements on both sides to enable persons in the water to board the lifeboat.
What is the correct name of the part highlighted in the illustration?
Which component does this graphical symbol illustrate?
Pressure indicator, installed on panel/console.
Pressure indicator, installed locally.
Pressure relief valve, self-contained.
Vibration analysis is often used as a conditioning monitoring tool onboard ship as part of the approved planned maintenance system. Many vibration measuring instruments are fitted with a harmonic filter/analyser. How would these filters normally be used during vibration measurement on a centrifugal pump?
To block out any noise or vibration from the surrounding engine room.
To generate an audible sound signal at the same frequency and amplitude as the vibration.
To isolate a single frequency of vibration associated with one of the pumps components.
To sum up all the harmonics of a base frequency to give total vibration for all of the pump’s components simultaneously.
A section of seawater pipe has been removed for maintenance. When refitting the pipe after completing the work the bolt holes in the flanges are found to be misaligned. What procedure should be followed to finish the work?
Adjacent pipework should be slackened off to allow the pipe to be aligned. Any incorrectly positioned brackets should be adjusted after the pipe is refitted.
Use a chain block to pull the pipe flanges into alignment and leave it in place after the bolts are fitted to avoid overstressing the bolts.
Use wooden wedges to force and hold the pipe into the correct position and then fit the bolts.
Force the pipe into position and then hammer the bolts into the holes to hold the pipe flanges into alignment.
A detector that is activated by a rise of temperature is:
An air compressor is being refitted in the engine room. The compressor and motor are coupled using a flexible coupling and are mounted on a common “skid” which fixed to the deck with resilient mountings. Which of the statements, from the options given, relating to the alignment of the motor and compressor is true?
Shims should be fitted between the motor and compressor feet and the skid to ensure correct vertical, horizontal and parallel alignment of the coupling halves before it is bolted up.
As long as the two coupling halves are at the same height the flexible coupling will accommodate any horizontal misalingment of difference in the gap between the coupling faces.
The compressor and motor can just be placed directly on the common skid as they will probably be closely aligned anyway.
Machines using flexible couplings and resilient mountings do not need to be aligned. That is why they have flexible and resilient elements fitted.
Which of the following alternatives summarise the benefits of using high voltage on ships?
Smaller conductors, machines and switchgear.
Smaller conductors, insulators and transformers.
Smaller cables and better power factors.
More efficient transformers and electrical machines.
Which diagram is the symbol for a THYRISTOR?
What is the correct method to use for fitting a rolling contact bearing, such as a ball bearing, onto a parallel shaft?
Use a hammer and a pipe with the same diameter as the inner bearing ring and knock the bearing onto the shaft.
Use emery cloth on the bearing surface on the shaft.
Use emery cloth on the inner ring (contact surface) of the bearing.
Gently heat the bearing in an oil bath and use a bearing puller to draw it onto the shaft.
Why is it important to check the timing of diesel engine cylinder oil lubricators?
To ensure the piston is not covering the lubrication points and blocking the flow of cylinder lubricating oil into the cylinder.
To ensure the correct amount of cylinder lubricating oil is fed into the cylinders.
To ensure cylinder lubricating oil enters the cylinders when the piston is in the required position.
To avoid excess pressure in the cylinder lubrication system.
What is the correct name of the part highlighted in the illustration?
On some large slow speed engines the crosshead guides are adjustable to allow the clearance between the crosshead shoes and the guides to be set equally. The normal arrangement is to have bolted on guide bars with shims fitted behind them. Which of the methods given in the options is the one normally used to ensure this is done correctly?
Fit an equal number of shims behind each guide bar which should result in equal clearances between the guide bars and shoes along the whole length.
Turn the engine so that the piston for the cylinder concerned is at TDC and measure the clearance along the length of each bar and shoe and fit shims to equalise the clearances.
Turn the engine so that the piston skirt is at the bottom of the liner. Use wedges to centralise the piston. Measure the clearances along the length of each bar and shoe and fit shims to equalise the clearances.
Turn the engine so that the piston for the cylinder concerned is at BDC and measure the clearance along the length of each bar and shoe and fit shims to equalise the clearances.
Which of the following voltage levels would be regarded as high voltage likely to be found on a ship?
The exhaust gas temperatures of all cylinders of a diesel engine are seen to be high. Select, from the options given, the most likely cause of this:
Insufficient cooling of the main bearings.
High wear rate in one of the fuel injection pumps.
One of the fuel cams is worn.
What type of component does this graphical symbol illustrate?
Pressure-reducing regulator.
What do you understand by the order: “Move the pilot ladder to the other side?”
Move the pilot ladder to the other side, means: to move the pilot ladder further along nearer to the bow.
Move the pilot ladder to the other side, means: to rig another pilot ladder.
Move the pilot ladder to the other side, means: to change the position of the pilot ladder from the main deck to the fore deck.
Move the pilot ladder to the other side, means: to shift the pilot ladder to the opposite side of the ship.
Under what circumstances would you remove guards and safety devices from machinery?
To allow the shaft to be seen to confirm the machine is running.
When they are rattling and vibrating.
During overhaul and maintenance procedures.
When the safety devices keep stopping the machinery.
What is one of the main features of the cylinder lubricating oil used in large 2 stroke marine diesel engines which normally operate on heavy fuel oil?
It is neutral with a pH value of 7.
It is a pure mineral oil without any special additives.
During maintenance work on a compensated mechanical hydraulic governor air is drawn in to the hydraulic circuit after draining and flushing out the unit. Which of the actions given in the options is most likely to assist in the removal of the air from the system?
With the governor in operation open the compensation needle valve to introduce instability and disturb the engine load to make the governor hunt.
Overfill the governor with fresh oil to force all of the air out.
Drain the governor again and slowly refill with fresh oil.
With the governor in operation close the compensation needle valve and disturb the load to make the engine hunt.
What would be the correct form of response to the question: “What kind of assistance do you require?”
The correct form of response would be: “There is a fire onboard my vessel”.
The correct form of response would be: “My vessel has a fire in the accommodation and we require fire-fighting assistance”.
The correct form of response would be: “I need help on board with a fire and the smoke is very toxic”.
The correct form of response would be: “I need help as soon as possible”.
An earth fault exists on the blue line of a 100 A bilge pump circuit. A second earth fault occurs on the yellow line of a 10 A ventilation fan circuit. Both systems are supplied from the ship’s 440 V supply. The likely outcome is that:
A short circuit occurs between earth faults and the ventilation fan fuse blows.
An open circuit occurs between earth fault and both motors trip out.
A short circuit occurs between earth fault and the bilge pump fuse blows.
Both motors trip out on overload.
Which of the options represents the best action to take when an item of machinery, which normally operates in automatic mode, is operated in “manual” mode?
Keep the Chief Engineer informed of machines performance on an hourly basis.
Have someone permanently stationed at the machine in case of an operational problem.
Monitor the operation of the machinery on a frequent basis.
Change over all other machinery to manual mode of operation.
What is the correct name of the tool shown in the illustration?
What do you call the wide rung on a pilot ladder that prevents the ladder from twisting?
The wide rung on a pilot ladder that prevents it from twisting is called a “Spreader”.
The wide rung on a pilot ladder that prevents it from twisting is called a “Wide step”.
The wide rung on a pilot ladder that prevents it from twisting is called a “Long rung”.
The wide rung on a pilot ladder that prevents it from twisting is called a “Ani-twist rung”.
In a purifier assuming the separating temperature is correct, what is the probable cause of the processed oil containing water?
The back pressure at the clean oil outlet is too high.
The gravity disc is too small and/or the flow rate is too high.
The throughput is too low.
The gravity is too large.
Many large 2 stroke marine diesel engines are equipped with an auxiliary scavenge air blower. What is the purpose of this equipment?
To provide combustion air at start up, during manoeuvring and low load running when the turbocharger delivery is insufficient.
To allow full load running when the main turbocharger is defective.
To assist the main turbochargers in supplying combustion air when on full load.
To help cool the engine after it has been stopped.
New MARPOL regulations came into effect from July 93 stating that the previous instantaneous rate of discharge of oil content (60 litters per nautical mile) was changed to:
10 litters per nautical mile.
25 litters per nautical mile.
30 litters per nautical mile.
20 litters per nautical mile.
What cooling medium is normally used to cool the condenser of a fresh water generator?
The mandatory color of a hand flare is:
A flame detector is activated by:
Smoke, gas, sparks and high temperature.
The radiation of heat given off by flames.
The rise of the environment temperature.
The infrared radiation and ultraviolet radiation given off by flames.
An important quantity which is useful in circuit analysis is known as conductance G (Siemens). Which of the formulas A to D expresses the conductance for this circuit?
With two alternators running in parallel, and one is to be disconnected. The first step is to:
Remove the load from the alternator to be stopped.
Increase the frequency on the switchboard.
Trip the main circuit breaker.
Make sure the load is evenly shared.
During maintenance work on a main diesel engine the fuel injection valve is found to be jammed in the pocket in the cylinder cover. Which of the procedures given in the options should be followed in order to complete the work?
Wedge a bar between the piston top and the bottom of the injector and use the turning gear to force the injection valve out.
Replace the complete cylinder cover with a spare unit and land the cover with the jammed valve ashore for repair in a specialist workshop.
Remove the cylinder cover and try and drive the injection valve out of the pocket from the underside with a hammer and punch.
With the fuel injection valve retaining nuts removed admit compressed air into the engine cylinder to try and blow the injection valve out of the pocket.
For ideal synchronising as the incomer circuit breaker contacts make, the phase angle difference between the incomer e. m. f. and the busbar voltage should be:
During an unmanned period on a UMS vessel the “low water level” alarm for the jacket cooling water system expansion tank activities. What action would you take as duty engineer?
Answer the alarm then block the alarm function for later action and resume unmanned operation.
Answer the alarm then block the alarm and change to manned engineroom condition.
Answer the alarm and adjust the alarm set point for the water level in the expansion tank before resuming unmanned operation.
Answer the alarm, top up the tank and check the system for leakage before resuming unmanned operation.
What is the main advantage of having a central cooling system fitted on board ship?
It should require less maintenance than a conventional system using only sea water.
It is a simple system with minimum control requirements.
It does not require any seawater.
Only one heat exchanger is needed for all cooling duties.
MARPOL – Annex V. Disposal of garbage outside “Special Areas”. After unpacking spares, you are left with a limited amount of packing materials. Is this prohibited, if not, what will be the nearest distance to land for disposal into the sea of these materials?
Many large slow speed diesel engines operating on heavy fuel oil have a fuel injection system which features Variable Injection Timing. How does this affect engine operation?
VIT increases engine efficiency by automatically maintaining the maximum cylinder pressure over the entire load range.
VIT allows the ship’s engineers to alter the injection timing for each load setting with a simple single adjustment of the fuel rack.
VIT increases engine efficiency by automatically maintaining the maximum cylinder pressure over part of the load range.
What is the expansion ratio of the foam produced by the fixed low-expansion foam fire-extinguishing system of an engine room?
Greater than 20 to 1 but less than 50 to 1.
A power card taken from a diesel engine cylinder using a mechanical indicator has a flat top. Which of the possible actions given in the options is most likely to correct this irregularity on the power card?
Lengthen the cord for the indicator drum drive.
Change the indicator spring for one with a higher rating.
Shorten the cord for the indicator drum drive.
Lubricate the indicator piston and cylinder.
Which ships does the ISM code apply to?
All passenger ships, all cargo ships of 500 GRT or above.
Personnel in a high voltage switchroom and smell rotten eggs. What may this indicate?
Arcing at badly coupled bus bars.
Problems with a vacuum circuit breaker.
Problems with a gas (SF6) circuit breaker.
What do you understand by: “Let go the port anchor?”
Let go the port anchor means: slacken the port anchor cable.
Let go the port anchor means: put the port windlass brake in gear.
Let go the port anchor means: put the port windlass brake in gear and lower the anchor.
Let go the port anchor means: open the port windlass brake.
A mechanical seal, consisting of carbon and ceramic seal rings, is to be fitted to a centrifugal pump shaft. What is the most likely result of not being extremely careful when fitting this type of seal?
The seal rings are hard and may score the pump shaft.
The spring and bellows for the seal can be easily damaged.
The seal rings are brittle and can be easily chipped or damaged.
The rubber O rings for the seal can be easily damaged.
For a Nitrite – Borate based cooling water treatment system, what would be considered to be the normal nitrite concentration limits for a correctly dosed system?
3 000 – 4 500 ppm Nitrite.
1 500 – 3 000 ppm Nitrite.
4 500 – 6 000 ppm Nitrite.
B Class divisions in ships are constructed so that they are capable of preventing the passage of flame to the end of a standard fire test held for:
What is likely to be the cause of black smoke from a diesel engine exhaust seen at the funnel?
Engine is burning some lubricating oil.
Incomplete combustion of the fuel.
In a low pressure auxiliary boiler, what would be considered to be the maximum allowable chloride level of the boiler water?
A seawater pump requires overhaul but there are no spare wear rings for the casing and impeller. It is decided that new wear rings will be fabricated onboard using the ship’s lathe. What would be the most suitable material to use to fabricate the rings onboard?
What is the period of validity of the Safety Management Certificate?
An auxiliary engine is fitted with a duplex type lubricating oil filter. The in-use element requires changing. What procedure should be used to fit the new element?
With the engine running, position the changeover cock so that both filters are in use to reduce the pressure before.
With the engine running, shut off the filter inlet and quickly fit the new element.
The engine must be stopped to fit a clean filter element.
With the engine running, change over to the other filter after priming it and replace the dirty element after checking there is no pressure on dirty filter housing.
An earth fault exists on the blue line of a 100 A bilge pump circuit. A second earth fault occurs on the yellow line of a 10 A ventilation fan circuit. The likely outcome is that:
Both motors trip out on overload.
A short circuit occurs between earth faults and the ventilation fan fuse blows.
A short circuit occurs between earth fault and the bilge pump fuse blows.
An open circuit occurs between earth fault and both motors trip out.
Is it necessary to cool the samples taken from a diesel engine cooling water system before carrying out tests to determine the concentration of treatment chemicals?
No, the test should be carried out at system temperature.
Yes, the samples should be cooled to approximately 25 °C.
Yes, the samples should be cooled to approximately 50 °C.
No, the samples should be heated to approximately 95 °C.
If a refrigeration system contains air, how would you remove it from the system?
Pump the system down to the evaporator and keep the fan running until the evaporator is at ambient temperature and vent off the air from the top of the evaporator.
Stop the compressor and vent the air from the crankcase.
Pump the system down to the condenser, continue cooling water flow until the condenser is at the same temperature as the cooling water and vent off the air from the top of the condenser.
Stop the compressor and undo a pipe coupling at the highest point in the system to vent off the air.
During maintenance of a pneumatically operated, diaphragm actuated control valve the diaphragm is found to be split. Select, from the options given, a suitable material to use to make a temporary replacement if there is no spare diaphragm available.
Natural rubber sheet of approximately the same thickness and elasticity as the original diaphragm material.
Cotton reinforced rubber insertion sheet of smaller thickness but similar strength as the original diaphragm material.
Natural rubber sheet of greater thickness and lower elasticity as the original diaphragm material.
Cotton reinforced rubber insertion sheet of approximately the same thickness but less elasticity than the original diaphragm material.
What is the disadvantage of using chemicals on an oil-spill on the water?
It is difficult to apply the chemicals if the oil drifts away from the ship’s side.
The chemicals make it difficult to remove the oil from the water.
It is difficult to apply chemicals if there is any wind.
The water gets a white colour, which makes it easy to detect the oil-spill.
After main power is restored (following a blackout), a timed sequential restart of motor driven auxiliaries is necessary to avoid:
Generator overload due to many motors starting at simultaneously.
Overvoltage due to current surges.
Overloading creating earth faults.
Over-frequency due to overspeed of generator.
What acton is required if the crankcase relief valve on an air compressor is operating and emitting an air and oil mixture?
Increase the lift pressure of the relief valve.
Overhaul the compressor unit.
Increase the flow of cooling water to the compressor and intercooler.
Place a drip can beneath the valve to collect any escaping oil.
What action should be taken by the engine room rating if a piece of machinery is not functioning properly?
If machinery does not function properly, the Chief Engineer should be called out immediately.
If machinery does not function properly, it should be immediately stopped every time.
If machinery does not function properly the duty Engineer should be informed immediately so that plans for further action can be made.
If machinery does not function properly, it should be stopped and serviced immediately.
The correct time to synchronise is usually taken to be when the synchroscope reaches the “5 to 12” position and is rotating slowly clockwise. This to allow for:
Generator phase difference error.
Circuit breaker operating time.
Synchroscope pointer time lag.
What is the approximate content of oxygen in air?
What is the correct name of the part highlighted in the illustration?
For two generators running in parallel, their share of additional load (kW) will be determined by the:
Voltage droop setting on each AVR.
Governor droop settings on each prime mover.
The temperature difference between the generator rotors.
The power factor of the additional load.
The circuit consists of two inductors, L(1) = 6 H and L(2) = 12 H, connected in parallel. Calculate the equivalent L(S) of the two inductors.
When you join a new ship, how are you informed about safety rules, alarm instructions and your own duties in case of an emergency?
By folder distributed to each crewmember.
By muster list exhibited in conspicuous places.
By alarm instructions in all crew cabins.
By oral instructions by the Captain.
Many large slow speed diesel engines operating on heavy fuel oil have a fuel injection system which features Variable Injection Timing. How does this affect engine operation?
VIT increases engine efficiency by automatically maintaining the maximum cylinder pressure over the entire load range.
VIT increases engine efficiency by automatically maintaining the maximum cylinder pressure over part of the load range.
VIT improves engine operation by automatically controlling the start of fuel injection when it detects a poor quality fuel.
VIT allows the ship’s engineers to alter the injection timing for each load setting with a simple single adjustment of the fuel rack.
During an unmanned period on a UMS vessel the “low water level” alarm for the jacket cooling water system expansion tank activates. What action would you take as duty engineer?
Answer the alarm then block the alarm and change to manned engine room condition.
Answer the alarm then block the alarm function for later action and resume unmanned operation.
Answer the alarm and adjust the alarm set point for the water level in the expansion tank before resuming unmanned operation.
Answer the alarm, top up the tank and check the system for leakage before resuming unmanned operation.
What is meant by the term “feel over sequence” as applied to diesel engine operation following replacement of a crankshaft bearing?
Stopping the engine to check the bearing temperature after a short period of operation and repeating this procedure at increasing running intervals.
Running the engine at low load and gradually increasing the load over a period of 12 hours.
Stop the engine after 2 hours running to check the bearing temperature by running the hand over it.
The responsibility for safety and security rests with everybody on board the vessel. General house-keeping rules should be followed. Which of the listed rules is the most important?
Do not carry lighters or matches when working outdoors.
Always use gloves when using grinding machines.
Keep tools within easy reach during work.
Keep your working area clean and tidy.
How many separate means of escape are provided from each fire zone above the bulkhead deck?
A large electric motor is being removed from a main seawater pump with the aid of the engine room crane. Which is the best method of starting the lift from the options given?
Use the full hoist facility on the crane to “break” the motor free after slackening all of the retaining bolts.
Use the “inch up” facility on the crane to “break” the motor free after slackening all of the retaining bolts.
Use a suitable chain block suspended from the crane hook to “break” the motor free after slackening all of the retaining bolts.
Use the full hoist facility to lift the motor clear in one action after removing all of the retaining bolts.
What is the correct name of the part highlighted in the illustration?
An electrical power emergency source in a ship is required because:
It satisfies the SOLAS requirements for ship safety.
The main diesel generator(s) can be taken out of service for overhaul or repair.
It satisfies the need to be environmentally “friendly”.
The ships total load can be shared between main and emergency generators.
A ship moving through heavy seas is affected by the water presure at the bows causing an effect known as “Panting”. What structure in the forward region of the ship combats the effects of Panting?
Double bottom tanks and floors.
Panting beams and stringers.
Collision bulkhead and deck.
What will be the probable outcome if the amplification is set too high on a controller?
The process will oscillate and get out of control.
The set-point will change.
The process response will be very slow.
What is the main effect on lubricating oil of operating for long periods at excessively high temperature?
It will cause the oil to oxiside, increasing the viscosity.
It will cause the oil to oxidise, reducing the viscosity.
It will cause the oil to evaporate, increasing consumption.
It will change the flashpoint of the oil.