Which of the following are some of the requirements that personnel in the risk assessment team must meet?
Répondre
Which colour in the risk matrix represents levels of risks in the As Low As Reasonably Practicable (ALARP) region?
Yellow.
Green.
Red.
During the task, if you are uncertain or unsure about ANYTHING then you must stop the job and ask for advice.
True.
False.
What is the remaining risk called when prioritised risks have been controlled and lowered to a tolerable and acceptable level?
Residual risk.
Acceptable risk.
Tolerable risk.
Initial risk.
Assessed risk.
What are the five steps of risk management?
Répondre
The success of the Risk Assessment depends a great deal upon how effectively it is communicated. Which three statements are correct?
Répondre
Dynamic risk assessment is important in constantly changing external and internal environments. What are the purposes of continually monitoring and reviewing the risk assessment while the work task is ongoing?
Répondre
Which three elements does a Bow-tie diagram give a visual summary of?
Répondre
There are no requirements to maintain risk assessment records.
False.
True.
In which step of the risk management process is the risk level compared against established risk criteria?
Assess.
Analyse.
Identify.
Control.
Monitor.
Тест оценивает навыки по оценке рисков и разработке мер по снижению возможных опасностей на борту судна.
Seuls les marins peuvent laisser des avis. Pour laisser un avis, connectez-vous au site en utilisant votre compte marin.
Soyez le premier à évaluer ce test en ligne !
Global Application$$$
Nous utilisons des cookies pour offrir la meilleure expérience sur notre site. Si vous continuez à utiliser le site, nous considérerons que cela vous convient.Accepter