Titre d'emploi | Navire | DWT | Type de navire | Contracter |
---|
Chief Engineer | | DWT: 3 783 | Type de navire: Jackup Barge | Contracter: - (4 m. 2 d.) |
Chief Engineer | | DWT: 3 783 | Type de navire: Jackup Barge | Contracter: - (3 m. 18 d.) |
Chief Engineer | | DWT: 3 783 | Type de navire: Jackup Barge | Contracter: - (4 m. 10 d.) |
Chief Engineer | | DWT: 3 783 | Type de navire: Jackup Barge | Contracter: - (6 m. 3 d.) |
Chief Engineer | Navire: | DWT: 3 239 | Type de navire: AHTS | Contracter: - (7 m. 8 d.) |
Chief Engineer | Navire: | DWT: 40 978 | Type de navire: Cable/Pipe Layer | Contracter: - (27 m. 13 d.) |
Chief Engineer | | DWT: 290 | Type de navire: Jackup Barge | Contracter: - (5 m. 1 d.) |
Chief Engineer | Navire: | DWT: 40 978 | Type de navire: Cable/Pipe Layer | Contracter: - (4 m. 2 d.) |
Chief Engineer | | DWT: 290 | Type de navire: Jackup Barge | Contracter: - (4 m. 4 d.) |
Chief Engineer | Navire: | DWT: 40 978 | Type de navire: Cable/Pipe Layer | Contracter: - (15 m. 27 d.) |
Chief Engineer | Navire: | DWT: 9 775 | Type de navire: Heavy Lift | Contracter: - (4 m. 29 d.) |
Chief Engineer | Navire: | DWT: 5 000 | Type de navire: Container | Contracter: - (4 m. 2 d.) |
Chief Engineer | Navire: | | Type de navire: AHTS | Contracter: - (3 m. 13 d.) |
Chief Engineer | | DWT: 290 | Type de navire: Jackup Barge | Contracter: - (2 m. 17 d.) |
Chief Engineer | Navire: | | Type de navire: Heavy Lift | Contracter: - (3 m. 12 d.) |
2nd Engineer | Navire: | DWT: 38 121 | Type de navire: Container | Contracter: - (5 m. 16 d.) |
2nd Engineer | Navire: | DWT: 38 121 | Type de navire: Container | Contracter: - (5 m. 14 d.) |
2nd Engineer | Navire: | DWT: 1 039 | Type de navire: AHTS | Contracter: - (2 m. 12 d.) |
2nd Engineer | Navire: | DWT: 3 860 | Type de navire: Diving boat | Contracter: - (1 m. 22 d.) |
2nd Engineer | Navire: | DWT: 4 890 | Type de navire: Diving boat | Contracter: - (1 m. 2 d.) |
2nd Engineer | Navire: | DWT: 66 000 | Type de navire: Cable/Pipe Layer | Contracter: - (2 m. 6 d.) |
2nd Engineer | Navire: | DWT: 66 000 | Type de navire: Cable/Pipe Layer | Contracter: - (2 m. 24 d.) |
2nd Engineer | Navire: | DWT: 20 645 | Type de navire: Cable-laying Barge | Contracter: - (1 m. 3 d.) |
2nd Engineer | Navire: | DWT: 20 645 | Type de navire: Cable/Pipe Layer | Contracter: - (1 m. 28 d.) |
2nd Engineer | Navire: | DWT: 20 645 | Type de navire: Cable/Pipe Layer | Contracter: - (1 m. 7 d.) |
3rd Engineer | Navire: | DWT: 20 645 | Type de navire: Cable/Pipe Layer | Contracter: - (1 m. 14 d.) |
3rd Engineer | Navire: | DWT: 20 645 | Type de navire: Cable/Pipe Layer | Contracter: - (1 m. 21 d.) |
3rd Engineer | Navire: | DWT: 20 645 | Type de navire: Cable/Pipe Layer | Contracter: - (1 m. 12 d.) |
3rd Engineer | Navire: | DWT: 20 645 | Type de navire: Cable/Pipe Layer | Contracter: - (3 m. 19 d.) |
3rd Engineer | Navire: | DWT: 20 645 | Type de navire: Cable/Pipe Layer | Contracter: - (3 m. 1 d.) |
3rd Engineer | Navire: | DWT: 20 645 | Type de navire: Cable/Pipe Layer | Contracter: - (2 m. 13 d.) |
3rd Engineer | Navire: | DWT: 20 645 | Type de navire: Cable/Pipe Layer | Contracter: - (2 m. 6 d.) |
3rd Engineer | Navire: | DWT: 20 645 | Type de navire: Cable/Pipe Layer | Contracter: - (4 m. 1 d.) |
3rd Engineer | Navire: | DWT: 42 151 | Type de navire: Heavy Lift | Contracter: - (4 m. 6 d.) |
3rd Engineer | Navire: | DWT: 42 151 | Type de navire: Heavy Lift | Contracter: - (5 m. 8 d.) |
3rd Engineer | Navire: | DWT: 42 151 | Type de navire: Heavy Lift | Contracter: - (3 m. 19 d.) |
3rd Engineer | Navire: | DWT: 42 151 | Type de navire: Heavy Lift | Contracter: - (4 m. 5 d.) |