What should be discussed during the Pre-Lift Safety Meeting?
The roles and responsibilities of the Lift Team.
The results of the risk assessment.
Where barriers and signs should be placed to ensure that the lift area remains free from unauthorised entry.
The isolation confirmation certificate.
Break times.
Antwort
What happens if the load to be lifted is heavier than the Safe Working Load of the crane?
A warning light and alarm will sound in the Crane Operator’s cab.
The Crane Operator shall consult the Banksman before carrying on with the lift.
The Crane Operator must override any alarms and carry on with the lift.
Crane hooks should be inspected for which of the following?
Nicks and gouges.
Deformation.
Wear and corrosion.
The date of manufacture.
The maker’s mark.
Antwort
What types of cargo do bulk carriers normally ship?
Steel Coils.
Cement.
Crude oil.
Ore.
Coal.
Grains.
Antwort
The hand signal internationally recognised for an emergency stop is both arms raised with palms facing forward.
True.
False.
Remedial ____ are then put in place to reduce the risk of a hazard occurring to as ____ as reasonably practicable (ALARP).
… actions … low.
… actions … large.
… equipment … high.
All lifting equipment, including cranes, must be certified and clearly show the Safe Working Load (SWL).
True.
False.
Which of the following must be carried out before every lift?
A risk assessment.
A COSHH assessment.
Atmospheric testing.
How often should a visual inspection of the crane be carried out?
Every day and before use.
Annually and after every third use.
Once every three months and after every use.
Once hazards have been identified, what is the next step in the risk assessment process?
Assessing the likelihood of the hazards occurring.
Gas testing.
Implementing controls that increase the risks to an unacceptable level.
If a derrick winch is powered by electricity, what happens if the power supply is lost?
The winch will automatically apply a brake to stop the lift and maintain the load in a safe position.
The Crane Operator shall lower the load to the deck.
The Crane Operator shall slew the crane 90 degrees.
Before the lifting operations begin, the Captain should visit the worksite to identify if there are any additional hazards that were not identified during the risk assessment.
True.
False.
What is the ideal included angle between chains when lifting a load using twin chains attached to a master link?
90 degrees.
45 degrees.
180 degrees.
A typical ____ crane is of the overhead ____ type. Engine room gantry run on ____ allowing the crane to run from the ____ to the aft of the engine room.
… gantry … bridge … rails … fore.
… bridge … gantry … rails … fore.
… engine room … girders … rails … fore.
Этот тест оценивает знания по безопасному использованию судовых кранов для грузовых операций.
Nur Segler können Bewertungen hinterlassen. Um eine Bewertung abzugeben, melden Sie sich mit Ihrem Sailor-Konto auf der Website an.
Seien Sie der Erste, der diesen Online-Test bewertet!
Global Application$$$
Wir verwenden Cookies, um die bestmögliche Darstellung unserer Website zu gewährleisten. Wenn Sie die Website weiterhin nutzen, gehen wir davon aus, dass Sie damit einverstanden sind.