If there is maintenance work being carried out in the engine room by another engineer the location of the maintenance work should be passed on to the relieving officer.
If it seems like the relieving officer is not in a condition to carry out the watch duties efficiency, do not hand over the watch and inform the Chief Engineer.
There is no need to use a checklist as a part of the vessel safety management system.
Antwort
Where will be the alarm sound if the UMS is in control but there is an issue with engine room machinery?
The duty engineer’s cabin.
The duty officer’s cabin.
The captain’s cabin.
Engine room watchkeeping is integral to the marine engineer’s duties on board a ship. It should be carried out efficiently to ensure the safety of the crew and the vessel.
True.
False.
The number of engineers appointed to a ship will depend on which of the following factors?
The type of ship.
The area of operation.
The Safe Manning Certificate issued by the Flag State.
The length of the voyage.
Antwort
Which of the following pieces of information should be passed on to the relieving officer when handling over the watch?
The levels of important tanks, such as ballast, bilges, sewage, reserve, slop, fuel or any tank, that may require attention.
Any special orders related to the operation of the ship, the control system or maintenance work.
All checks that have been made when entering or leaving a port.
Standing orders from the Chief Engineer or the company.
Which machinery checks can be skipped to save time.
Antwort
There may be more than one engine room on some ships, for example, at the forward and the aft, or only one, at the port or starboard side.
True.
False.
All members of the engine room watch should have knowledge of which of the following?
The survival procedures to follow in case of emergency.
Their duties to a high level.
The location of safety equipment, such as fire-fighting equipment, and how it is used in the machinery space.
What is happening on the bridge at all times.
Antwort
Which of the following hazards might be found in the engine room?
Heavy moving machinery.
Enclosed spaces.
Spaces that can be difficult to reach.
Power operated watertight doors.
Galley equipment.
Antwort
Which of the following additional actions can an engineer do to ensure a safe watch?
Avoid fatigue.
Never neglect an alarm.
Obey orders.
Communicate clearly.
Call for help when in need.
Skip some machinery checks to save time.
Antwort
Этот тест оценивает знания и навыки по дежурству в машинном отделении, включая эксплуатацию оборудования и мониторинг систем судна.
Nur Segler können Bewertungen hinterlassen. Um eine Bewertung abzugeben, melden Sie sich mit Ihrem Sailor-Konto auf der Website an.
Seien Sie der Erste, der diesen Online-Test bewertet!
Global Application$$$
Wir verwenden Cookies, um die bestmögliche Darstellung unserer Website zu gewährleisten. Wenn Sie die Website weiterhin nutzen, gehen wir davon aus, dass Sie damit einverstanden sind.