What should be discussed during the Pre-Lift Safety Meeting?
Ответить
What happens if the load to be lifted is heavier than the Safe Working Load of the crane?
A warning light and alarm will sound in the Crane Operator’s cab.
The Crane Operator shall consult the Banksman before carrying on with the lift.
The Crane Operator must override any alarms and carry on with the lift.
Crane hooks should be inspected for which of the following?
Ответить
What types of cargo do bulk carriers normally ship?
Ответить
The hand signal internationally recognised for an emergency stop is both arms raised with palms facing forward.
True.
False.
Remedial ____ are then put in place to reduce the risk of a hazard occurring to as ____ as reasonably practicable (ALARP).
… actions … low.
… actions … large.
… equipment … high.
All lifting equipment, including cranes, must be certified and clearly show the Safe Working Load (SWL).
True.
False.
Which of the following must be carried out before every lift?
A risk assessment.
A COSHH assessment.
Atmospheric testing.
How often should a visual inspection of the crane be carried out?
Every day and before use.
Annually and after every third use.
Once every three months and after every use.
Once hazards have been identified, what is the next step in the risk assessment process?
Assessing the likelihood of the hazards occurring.
Gas testing.
Implementing controls that increase the risks to an unacceptable level.
If a derrick winch is powered by electricity, what happens if the power supply is lost?
The winch will automatically apply a brake to stop the lift and maintain the load in a safe position.
The Crane Operator shall lower the load to the deck.
The Crane Operator shall slew the crane 90 degrees.
Before the lifting operations begin, the Captain should visit the worksite to identify if there are any additional hazards that were not identified during the risk assessment.
True.
False.
What is the ideal included angle between chains when lifting a load using twin chains attached to a master link?
90 degrees.
45 degrees.
180 degrees.
A typical ____ crane is of the overhead ____ type. Engine room gantry run on ____ allowing the crane to run from the ____ to the aft of the engine room.
… gantry … bridge … rails … fore.
… bridge … gantry … rails … fore.
… engine room … girders … rails … fore.
Этот тест оценивает знания по безопасному использованию судовых кранов для грузовых операций.
Отзывы могут оставлять только моряки. Чтобы оставить отзыв, зайдите на сайт под учетной записью моряка.
Оставьте первый отзыв о данном онлайн-тесте!
Global Application$$$
Мы используем куки для наилучшего представления нашего сайта. Если Вы продолжите использовать сайт, мы будем считать что Вас это устраивает.Согласен